Specifications

Structure: RCC framed structure with
- earthquake resistant up to seismic zone 2
- Cement blocks / clay brick
- Cement Plastering
Painting: Interior: – All inside walls provided with putty finish
- Two coats of interior emulsion paint over primer coat
- OBD for ceiling
Exterior: – Two coats of acrylic paint
Doors: Main door & Bedroom doors – Teak wood frame and masonite designer shutter
Toilet & Balcony doors: – Flush Shutters
Windows / Ventilators: 3 track aluminium sliding windows with mosquito mesh
Aluminium ventilators with exhaust fan provision
Flooring: Vetrified tiles for all rooms
Anti skid ceramic tiles in bathrooms and balconies
Granite (sadarahalli) for staircase and common areas
Toilets: Concept type ceramic glazed tiles dado upto 7’ height
Granite counter top wash basin in master bed
Good quality vitreous ceramic ware for water closets and wash basins
ESS / Jaqvar make or equivalent CP Fittings
Water Supply: CPVC / UPVC pipes for water supply
24 HR water supply through borewells and BWSSB.
Under ground sump and overhead tank of suitable capacity
Drainage: PVC pipes for sanitary & drainage for the entire project
Kitchen: Stainless steel sink with drain board over granite platform
Dado upto 2’ height with glazed ceramic tiles over granite platform
Provision provided for water purifier, exhaust fan
Electrical: Concealed copper wiring
Modular Switches – Anchor make or equivalent
TV, telephone points in living and Master bed room
AC points in all bedrooms
Backup / Generator: Complete common area will have backup with generator
1 KV backup for each flat
Lift: Two Six Passenger and Two Service lifts of standard make for each block
General: Sewage Treatment Plant
Water Treatment Plant
Rain Water Harvesting